Aerial work platform and construction machinery rental in Teplice

Aerial work platform and construction machinery rental in Teplice

If you rent aerial work platforms and construction machinery in Teplice, you mostly work in or for the glass industry. The region at the southern foot of the Ore Mountains is a glass-making location with a long tradition, and the rhythm of orders follows not the building weather but the plant cycle: glass melting furnaces run continuously for years, and everything that needs doing on them and on the flue gas and filter technology falls into the planned shutdown. This page shows which machine classes suit these conditions - high halls, hot zones, fixed time windows and realistically calculated platform capacities.

Glass melting furnaces and cold repair: work during the planned shutdown

A glass melting furnace is not maintained in passing. Between two furnace campaigns comes the cold repair, and only after the cooling period can work be done on the crown, the lining, burners, regenerators and flues. The requirement is therefore not a single machine but a sequence - dismantling, break-out, rebuilding and relining need different classes. Let us know your requirement as soon as the cold repair date is fixed; by arrangement, we reserve machines for defined time windows.

Inside the hall on finished floors, electric scissor lifts are the basis: 6.30 to 33.00 m working height, platform capacities from 227 to 1,000 kg and the largest platform area of all classes - important when break-out material and tools have to go up too. Where indoor and outdoor work alternate, hybrid scissor lifts are the alternative, because the same machine can stay in the yard and in the hall. For cramped platform levels and maintenance walkways, mast lifts with 10.00 to 12.65 m are the only class that fits through standard doors.

High halls, hot zones, real platform capacity

Production halls in the glass industry are built high because flue gas ducting, heat recovery and filter technology sit above the plant. Even during a shutdown, the lining and flues give off residual heat for a long time, and the temperature increases towards the top - exactly where the work is done. So clarify in advance whether the work area has cooled down and whether forced ventilation is running.

Platform capacity is the most common planning error in plant maintenance. What matters is not the number of people but the total weight of fitter, protective equipment, cordless tools, cable drum and the component being replaced. Two fitters with this equipment exceed 300 kg; this rules out the 227 kg models. Over pipelines, ducts and filter chambers, articulating boom lifts with 10.89 to 48.15 m offer the up-and-over reach that a scissor lift structurally lacks; outside on chimneys and roof structures, telescopic boom lifts with 14.00 to 56.90 m reach the furthest.

Mechanical engineering, hall services and the slopes at the foot of the Ore Mountains

Mechanical engineering around Teplice works in the same types of hall, but at a different rhythm: shorter, more frequent interruptions instead of one long shutdown. Work is in demand on crane runways, hall lighting, utility lines and doors, as well as conversions of machining centres; manoeuvrability and short set-up times matter more than maximum height, and 8 to 12 m covers most of it. On factory yards and unpaved expansion areas, diesel scissor lifts with all-wheel drive are the right choice: 9.70 to 34.00 m with up to 1,134 kg platform capacity.

Towards the mountains the terrain rises, and on the higher-lying commercial sites longitudinal and cross gradients are to be expected. For machines with a travel drive, the permissible gradient is a hard criterion: it decides whether a machine may be used on the site. On slopes, spider lifts with 13.00 to 39.50 m are the more robust choice - tracked undercarriage, low ground pressure, narrow transport width. The town's spa operations play only a marginal role for the rental fleet; there it is about maintenance of existing buildings with the same indoor classes.

The rental fleet in figures

ClassWorking heightBasket capacity
Scissor lifts electric6.30 - 33.00 m227 - 1,000 kg
Scissor lifts diesel9.70 - 34.00 m363 - 1,134 kg
High-rack scissor lifts18.50 - 33.00 m450 - 1,000 kg
Articulating boom lifts10.89 - 48.15 m150 - 450 kg
Telescopic boom lifts14.00 - 56.90 m227 - 454 kg
Mast lifts10.00 - 12.65 m200 kg
Spider lifts13.00 - 39.50 m200 - 400 kg

Construction machinery for Teplice: telehandlers, excavators and forklifts

Telehandlers take over material transport and installation lifting where no overhead crane reaches. Fixed models lift 4.30 to 18.80 m with a load capacity of 1.25 to 25 t; with suitable attachments, they become a fork carrier, a load hook solution or a bucket machine - during furnace relining this saves a second machine.

Excavators are available with an operating weight of 1.8 to 30 t, on plant sites mostly in the lower and middle range for utility trenches, foundations and interior demolition. For in-plant handling, electric forklifts are the choice; in addition there are stackers with 2.70 to 5.50 m lift height and 1.2 to 2.0 t load capacity.

Inspection, documentation and operator obligations in the Czech Republic

Every machine comes with an inspection record, CE documents and operating manual. Operator obligations on site follow the law of the country of use. For the Czech Republic, this is Government Regulation No. 378/2001 Coll., supplemented by a separate annex for equipment for lifting loads and persons; the basis for inspecting mobile elevating work platforms is CSN EN 280. In addition, the Labour Code (No. 262/2006 Coll.) and Act No. 309/2006 Coll. apply.

Risk assessment and operator instruction remain with the hirer - in glass production extended by the plant's permits for work on the shut-down plant and by requirements on residual heat and length of stay. The daily check for visible defects and function remains the operator's task.

Transport to Teplice

Teplice is around 330 km from our base in Passau. Usti nad Labem lies immediately to the east; assignments in both cities can be scheduled in one tour. We provide low-loaders and partner hauliers; we fix the delivery date together with your shutdown or installation schedule. It needs to be clarified whether the machine may enter the plant before the window begins. For requirements of several weeks, we invoice at long-term rental rates.

Rent aerial work platforms -> | Send an enquiry ->